Charon v8.1 is a stun-bombing scanner which entered the Intel 88 hill in January 1993 and survived 629 challenges before being pushed off in March.
;redcode
;name Charon v8.1
;author Cisek,Strack,Kline
;strategy creation date 4/22/92
;strategy v2.0 4/22/92 total code overhaul
;strategy mod 3 cmp scan with optimal step, new deadly trap (SPL 0, JMP -1)
;strategy v3.0 5/3/92 integrated with Stefan Strack's Echo (much smaller)
;strategy v4.0 5/8/92 [pretty much a failure]
;strategy v5.0 5/12/92 same as 3.0, new clear core routine
;strategy v6.0 6/11/92 finally moved off axis (v5.0 was getting slaughtered
;strategy by programs copied across the axis)
;strategy v7.0 7/6/92 2 instructions smaller, different constants,
;strategy linear decrement triggers clear core.
;strategy [no longer hits itself to start clear core]
;strategy v8.0 12/22/92 now forward-scans for an extended time
;strategy using step-size that kills slow-moving imps
;strategy also protecting 3 lines against decrement
;strategy v8.1 1/25/93 new step-constants
;strategy Charon is the >original< spl/jmp bombing cmp scanner.
;strategy It scans using an off-axis CMP-scan, bombs with the spl/jmp
;strategy combination (thus slowing the enemy down), and eventually
;strategy clears the core with dats.
STEP equ 68 ;scan constants:
DIST equ 34 ;small, so can be reused in core clear
DJNOFF equ decr-DIST
FIRST equ DJNOFF+149 ;optimal offset to DJN train
attack add switch,@compptr ;switch A- and B-fields
mov jump,@comp
compptr mov split,<comp
scan add incr,@compptr
comp cmp FIRST-DIST,FIRST ;start executing here
slt #incr-attack+DIST+1,@compptr ;don't hit self
decr djn scan,<DJNOFF ;countdown to clear
jmz attack,0 ;enter clear when this is decremented
split spl 0,<2667 ;clear core
switch mov @0-DIST,<1-DIST
jump jmp -1,<2667
incr dat #STEP,#STEP
end comp